Our team completed a comprehensive 23,000-square-foot shingle roof replacement for Traditional Ward Academy Elementary School, part of the Tempe Elementary School District. This large-scale project required precision, efficiency, and a commitment to high-quality craftsmanship to ensure a durable and long-lasting roofing solution for the school.
Scope of Work:
- Full Roof Replacement: Removal of the existing aged roofing system and installation of a high-performance asphalt shingle roof designed for enhanced durability and weather resistance.
- Structural Integrity Assessment: Conducted a thorough inspection of the roof deck to ensure a solid foundation before installation.
- Moisture Protection & Insulation: Integrated advanced underlayment and waterproofing techniques to enhance energy efficiency and protect against water infiltration.
- Compliance & Safety: Adhered to all local building codes and school district safety regulations to minimize disruption and ensure a secure environment for students and staff.